Customization: | Available |
---|---|
After-sales Service: | Provide |
Warranty: | One Yaer |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Description
This series of machines integrate washing, filling and capping in one unit, can be used for different kinds of fruit juices and tea hot drink production. With only a few parts changed, the machine can also be used for mineral water filling. The advanced micro-negative pressure filling technology is used in this machine to make the filling is quick, steady and accurate. The beverage feedback system is well designed, the gas can be fed back separately, has no contact with beverage reduce the second time pollution and oxidation. This machine can meet all the technical requirements for hot drink filling below 95°c. All filling valves and beverage conducting pipes can be cleaned. And the automatic washing interface CIP is designed in the machine before capping. The RO water washing device is used to wash the bottle mouth to keep mould away from the bottle mouth. Magnetic torque is used for screw capping, the power of screw capping can be adjusted stepless. It can use constant power to screw capping the plastic caps. The human machine interface is the touch screen. The most advanced PLC control and frequency changing technologies are used in this machine. The cap feeding system can be controlled automatically, the filling temperature can be detected automatically. Alarm system for the over heat of the beverage. The filling will be stopped when the beverage temperature is too low and the beverage will flow back. When no bottles and caps are available, the machine will be in waiting state, and no caps will be applied.
Characteristics
- Integrated washing, filling, capping in one unit to realize automatic juice filling.
- Washing part: There is enough water pressure to clean bottles. And the washing water is from the RO system, it is purified water.
- Filling part: Adopted micro-negative pressure filling, and filling speed is quick, steady and accurate.
- Capping part: There is a set of automatic lid arranging device to drop into cap rail to make accurate capping. The capping system will automatic delete the opposite caps.
- Suitable for producing large capacity production.
- Hot filling machine is adopted return-flow system to keep the filling temperature.
- Juice filling machine is equipped a set of CIP system for washing pipes after the daily working.
- The machine is controlled by PLC with touch screen. The language can be chosen in Chinese, English and other language. Usually is English.
- The material of washing, filling and capping is SUS 304 which can be anti-corrosion, rust prevention and long life span.
model | RCGF | RCGF | RCGF | RCGF | RCGF | |
18-18-6 | 24-24-8 | 32-32-10 | 40-40-12 | 50-50-15 | ||
production capacity(500ml)(b/h) | 4000-6000 | 6000-10000 | 10000-15000 | 15000-20000 | 20000-24000 | |
filling precision | ±2mm(liquid level) | |||||
polyester bottle standerd(mm) | bottle diameter: φ50-φ100;height:150-310 | |||||
suitable cap shape | plastic screw cap | |||||
water pressure of washing bottle(Mpa) | 0.2-0.25(Mpa) | |||||
gas consumption(m3/min) | 0.1 | 0.4 | 0.5 | 0.5 | 0.6 | |
power(kw) | 4.4 | 5.2 | 6.2 | 7.8 | 10 | |
weight(kg) | 2800 | 4500 | 6000 | 7000 | 9500 | |
dimensions(L*W*H)(mm) | 2360*1830*2250 | 2900*2200*2250 | 3880*2200*2250 | 3700*3000*2350 | 4500*3500*2400 | |
We are one of professional famous manufacturer for every kind of beverage producing, filling, packing machines.
We can make the machine with different capacity, bottle and cap according your need.
Welcome your inquiry to us, thank you so much!
Min order: 1 Set
Port: ShangHai Port
Payment term: L/C, T/T, WESTERN UNION
30% deposit by T/T, 70% balance by T/T before shipment.
Packing detail: Wooden case package or blanket cloth package.
Delivery time: 20-25 days after 30% T/T payment.
Service:
We will provide whole drawing for bottle mould. Free charge for design on the mould. We can help you install the machine; from setting machine, testing, and to check the machine is on the good working condition. The buyer pays the round air tickets and 80usd as salary per person per day.
Delivery time:
30 days upon deposit and approval to the bottle drawing.
Payment term:
For machine: 30% T/T deposit within five days after the contract is signed against invoice of the seller. The balance of 70% will be paid before shipment.
Guarantee:
We response for 12 months warranty for the machine, however, it without any human conduct. And provide one-year free spare part for client. And send engineer to client's company, help install the machine, teaching their staff operate the machine and also, we do have a private school which help our client sending their staff to china, help them training.
After sales service:
We will solve the problem by phone first ,and send the spare parts by DHL,Or if you need engineer in your factory ,you need pay travel expenses; hotels, airfares, meals and ground transportation and any other expenses related to installation and training at customers facility.