Customization: | Available |
---|---|
After-sales Service: | Provide |
Warranty: | One Yaer |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Description
1) The glass bottle juice filling machine is used in production of non-soda drink of fruit juice packed in glass bottles.
Washing, filling and capping are integrated in one machine.
2) The most advanced technology from Japan and Germany is employed in the design. The gravity fixed liquid surface filling is used. The filling is fast, the amount of liquid is accurately controlled and the dropping and leakage are avoided.
3) Spring cramps of the bottle juice filling machine are used in the bottle washing process. The empty bottles can be turned over 180~ along the conveying rail. There are two times of internal and external washing, the efficiency of bottle washing is high.
4) The magnetic torque is used for screw capping. The power of screw capping can be adjusted without steps. The power of the screw capping can also be fixed, and the caps will not be damaged, the capping is reliable.
5) The whole machine is controlled by PLC with touch-screen as the human-machine interface. The amount of the drinks in the storage tank can be controlled automatically. The filling and capping will be stopped automatically when there is no bottle. When bottles are cramped wrongly or when caps are not available, the machine can be stopped automatically.
6) The frequency changing technology is used to adjust the operation speed steplessly. The production capacity can be displayed digitally and can be adjusted conveniently.
7) The bottle juice filling line is set with a juice return tank system to guarantee the filling effect and juice temperature.
Technical parameter
Model | YFRG12-12-4 | YFRG18-18-6 | YFRG24-24-8 | YFRG32-32-10 | YFRG40-40-12 |
Production B/H(600ml) | 4000-5000 | 6000-8000 | 8000-12000 | 12000-15000 | 16000-20000 |
Bottle standard | Neck:φ50-100mmHeight150-320mm | ||||
Water pressure of washing bottle | 0.18-0.25Mpa | ||||
Water consumption for washing bottle kg/h | 1300 | 2000 | 3000 | 4000 | 5000 |
washing position | 12 | 18 | 24 | 32 | 40 |
Filling position | 12 | 18 | 24 | 32 | 40 |
Filing precision | +5MM | ||||
Gas source pressure | 0.4Mpa | ||||
Gas consumption(m³/min) | 0.3 | 0.4 | 0.5 | 0.7 | 0.8 |
Total power kw | 4.2 | 4.5 | 5 | 6.2 | 7.8 |
Total weight T | 2 | 2.5 | 3 | 4 | 6 |
Dimension (L*W*H)mm | 1800*1600*2100 | 2500*1750*2100 | 2700*2100*2100 | 3500*2100*2100 | 4000*2200*2200 |
Main equipment components
Main components of equipment: main machine includes floor racks, glass enclosed box, filling machines, capping machines, motors, wheel drive, wheel-shaped plate, cover and lower cover tanks, bottle chain and electrical control system components. Bottom welding by rectangular tubes and steel plate, on the surface and surrounded by covered stainless steel Panel, high strength, good rigidity, light weight, is the Foundation of whole set equipment, its base fitted with anchor bolts, adjustable level and high and low; Glass sealed around the surrounding box will host, with transparent glass doors at the top monitoring equipment, elegant appearance, the use of safe and reliable.
We are one of professional famous manufacturer for every kind of beverage producing, filling, packing machines.
We can make the machine with different capacity, bottle and cap according your need.
Welcome your inquiry to us, thank you so much!
Min order: 1 Set
Port: ShangHai Port
Payment term: L/C, T/T, WESTERN UNION
30% deposit by T/T, 70% balance by T/T before shipment.
Packing detail: Wooden case package or blanket cloth package.
Delivery time: 20-25 days after 30% T/T payment.
Service:
We will provide whole drawing for bottle mould. Free charge for design on the mould. We can help you install the machine; from setting machine, testing, and to check the machine is on the good working condition. The buyer pays the round air tickets and 80usd as salary per person per day.
Delivery time:
30 days upon deposit and approval to the bottle drawing.
Payment term:
For machine: 30% T/T deposit within five days after the contract is signed against invoice of the seller. The balance of 70% will be paid before shipment.
Guarantee:
We response for 12 months warranty for the machine, however, it without any human conduct. And provide one-year free spare part for client. And send engineer to client's company, help install the machine, teaching their staff operate the machine and also, we do have a private school which help our client sending their staff to china, help them training.
After sales service:
We will solve the problem by phone first ,and send the spare parts by DHL,Or if you need engineer in your factory ,you need pay travel expenses; hotels, airfares, meals and ground transportation and any other expenses related to installation and training at customers facility.