Structure characteristics: The plastic cooling tower filling is pressed by modified PVC in heat into trapezium wavy type.It is equipped with low-speed twisted space front-style wind machine.The blades are calibrated evenly and the balanced accuracy reaches ISO-2.5.
Body structure and performance: The 8ton fiber reinforced plastic cooling tower body is made of high-quality fiberglass reinforced plastics,the rubber coating surface of which is made of imported raw materials,which is even in color and will not fade or degrade easily.All structure parts made of steel are processed in hot-galvanizing.Injected molded parts are used widely for they are erosion-proof,high in intensity,light in weight and easy to attach.
The cooling tower has a successful water floating control,rendering a loss less than 0.001%. -Use low-speed wind machine to avoid too much water spray in the air; -Use water-proof sleeves on water distribution pipes to collect spilled water; -The ground frame is larger than enclosure and is equipped with PVC shutters to avoid water spilling out of tower.
Low-noise control principle: Lowering noise from the sound source.The special power machine is fulled closed automatic cooling type low-noise cooling tower.Such kind of machine is good at water-proof performance, low in noise.
Advantages: 1.Low-speed fan to avoid excessive mist into the air. 2.FRP body contains stable materials resisting ultraviolet radiation with a long service life. 3.Filled with round counter flow model film. 4.Rotating pipe distributing model. 5.Structure contains rust-removing and high-strength galvanized steel which can bear corrosion and can be easily assembled. 6.Different types(standard ,low-noise,high-temperature and industrial type) to meet your needs.
Service:
We will provide whole drawing for bottle mould. Free charge for design on the mould. We can help you install the machine; from setting machine, testing, and to check the machine is on the good working condition. The buyer pays the round air tickets and 80usd as salary per person per day. Delivery time:
30 days upon deposit and approval to the bottle drawing. Payment term:
For machine: 30% T/T deposit within five days after the contract is signed against invoice of the seller. The balance of 70% will be paid before shipment. Guarantee:
We response for 12 months warranty for the machine, however, it without any human conduct. And provide one-year free spare part for client. And send engineer to client's company, help install the machine, teaching their staff operate the machine and also, we do have a private school which help our client sending their staff to china, help them training. After sales service:
We will solve the problem by phone first ,and send the spare parts by DHL,Or if you need engineer in your factory ,you need pay travel expenses; hotels, airfares, meals and ground transportation and any other expenses related to installation and training at customers facility.